Trusting chamber air temperature
Air temperature is not core temperature. A record showing only air temperature is not a compliant record.
FixRequire probe traces from inside the wood.
Service
We heat treat pallets, crates and dunnage to ISPM-15 in our own chambers: 56°C core temperature held for 30 continuous minutes, verified by probes driven into the thickest component, stamped with our facility mark and logged against a charge number retained for seven years.
Request a quote
Send the quantity and we'll quote your actual lane — not a national average.
That last point matters for anyone weighing out rather than cubing out. On a 26-pallet trailer, 6 lb per pallet is 156 lb of payload recovered.
| Volume | Price per pallet | Turnaround |
|---|---|---|
| Under 200 units | $1.90 | 2–3 working days |
| 200–999 units | $1.55 | 1–2 working days |
| 1,000–4,999 units | $1.30 | 1–2 working days |
| 5,000+ units | $1.10 | Scheduled to your release |
| Crates and dunnage | By volume | Quoted per job |


By the numbers
Rules of thumb
Before you order
There is no sense treating a pallet that fails structurally next trip.
Otherwise the treatment is undone by the repair.
A solid block heats unevenly and the centre fails.
Thickest component of the centre-stack unit, not the accessible outer pallet.
The trace is the evidence. A certificate is somebody's assertion about it.
Two marks invite the wrong question at a border.
What goes wrong
Air temperature is not core temperature. A record showing only air temperature is not a compliant record.
FixRequire probe traces from inside the wood.
Probe temperatures drop within seconds and the 30-minute clock restarts.
FixOperators learn this once. It is also why suspiciously round total times are worth questioning.
Water absorbs enormous energy; a charge of wet pallets can take twice as long to reach temperature.
FixAllow for it in scheduling rather than cutting the cycle short.
Side by side
| Volume | Price per pallet | Turnaround |
|---|---|---|
| Under 200 units | $1.90 | 2–3 working days |
| 200–999 units | $1.55 | 1–2 working days |
| 1,000–4,999 units | $1.30 | 1–2 working days |
| 5,000+ units | $1.10 | Scheduled to your release |
| Crates and dunnage | By volume | Quoted per job |
Against our interest
ISPM-15 governs international movement. Treating pallets that never leave the country buys nothing except drier wood, which is occasionally worth it on its own but rarely worth planning around.
Heat treatment is a phytosanitary measure against wood-boring pests. It is not a food-safety sterilisation process and should never be presented as one.
Treatment does nothing for a cracked stringer. Inspecting and repairing first is not an upsell, it is the only sequence that makes financial sense.
What moves the price
| Driver | What it is | Rough effect |
|---|---|---|
| Charge volume | The chamber costs the same half full. This is the dominant driver. | $1.10 to $1.90 |
| Starting moisture | Water absorbs enormous energy; wet charges take far longer to reach core temperature. | Throughput, not unit price |
| Component thickness | The thickest member sets the cycle. Hardwood stringers take longer than SYP. | Cycle time |
| Collection and return freight | Quoted separately, and often pairable with an existing route. | Lane-dependent |
Due diligence
“Where exactly are the probes placed, and in what?”
“What happens to the clock if a probe dips below 56°C?”
“Can I have the probe trace for my charge?”
“How long are charge records retained, and in what format?”
“Do you fumigate at all, and if so with what?”
“How do you handle pallets that arrive with an existing mark?”
The rulebook
56°C minimum core temperature held for 30 continuous minutes for conventional heat treatment, plus marking requirements.
Wheat symbol, ISO country code, registered facility number and treatment code, applied permanently to at least two opposing sides.
In the United States, facility registration for ISPM-15 marking is issued through agencies accredited by the American Lumber Standard Committee.
The basis for the global methyl bromide phase-out, and the reason MB-marked wood is refused by an expanding list of destinations.
Vocabulary
From the journal
The mark has four required elements. I have seen shipments held because one of them was missing and nobody at either end knew what they were looking at.
The pallets were compliant. The crate was compliant. The two lengths of untreated 2x4 wedged against the load were not, and they were the first thing the inspector saw.
The mark on the wood is the declaration. The record behind it is the evidence. Most of the time nobody asks for the second one, and then somebody does.
Questions
Request a quote
Tell us what you’ve got