Comparing quotes with freight bundled differently
You are not comparing the same thing, and the larger number is hidden inside the smaller one.
FixRequire freight as a separate line from everyone you ask.
Buyer's guide
A recycled 48x40 pallet costs $8–$16 and a new one $22–$34, but those ranges are almost useless without context. Price is set by core availability in your lane, lumber futures, repair labour, freight distance and order size — and the last two are usually the largest.
Request a quote
Send the quantity and we'll quote your actual lane — not a national average.
| Item | Low | Typical | High |
|---|---|---|---|
| 48x40 recycled Grade C | $6.50 | $8.75 | $11.00 |
| 48x40 recycled Grade B | $8.50 | $11.50 | $14.00 |
| 48x40 recycled Grade A | $11.00 | $13.50 | $16.50 |
| 48x40 recycled A-clean | $12.50 | $15.00 | $18.00 |
| 48x40 new SYP | $21.00 | $25.00 | $29.00 |
| 48x40 new hardwood | $25.00 | $29.50 | $34.00 |
| 48x48 recycled B | $10.00 | $13.00 | $16.00 |
| 42x42 recycled B | $9.00 | $12.00 | $15.50 |
| Block pallet recycled A | $14.00 | $18.00 | $23.00 |
| 1200x800 EPAL, licensed | $26.00 | $34.00 | $44.00 |
| Heat treatment surcharge | $1.10 | $1.55 | $1.90 |
| Rackable HDPE plastic | $75.00 | $108.00 | $160.00 |
The largest single variable, and the one buyers control most directly. A trailer costs roughly the same whether it carries 380 pallets or 540. Consolidating orders to fill trailers is worth more than negotiating unit price in almost every case.
Metros with heavy inbound retail — Atlanta, Dallas, the Inland Empire, northern New Jersey — generate more cores than they consume, so recycled prices run low. Manufacturing corridors and remote regions consume more than they generate and run high.
New pallet prices track lumber almost directly. Recycled prices track it indirectly: when new gets expensive, demand shifts to recycled and the spread compresses. A lumber spike raises both, just at different speeds.
Grade A requires more sorting and more rejection. Every step up the grade ladder costs labour, and labour costs have risen faster than lumber over the last five years.
Q4 retail build-up tightens cores and raises recycled prices; Q1 releases them. Agricultural regions spike hard at harvest. If your demand is flexible, buying counter-cyclically is worth 5–10%.


By the numbers
Rules of thumb
Before you order
If a supplier will not separate it, that tells you something.
Most buyers do not know how many pallets are on a typical delivery.
40% less often, 60% more each time.
The backhaul pairing is the largest single lever.
Cheapest freight available if you have space and a lift.
A price that expires is an honest price.
What goes wrong
You are not comparing the same thing, and the larger number is hidden inside the smaller one.
FixRequire freight as a separate line from everyone you ask.
Retail build-up holds cores in distribution centres while demand rises. Prices rise 8–18%.
FixPlace a standing order in Q3 and buy counter-seasonally where storage allows.
A Grade C pallet under a racked load is how a quarter becomes memorable for the wrong reason.
FixCut freight cost, not structural margin.
Side by side
| Item | Low | Typical | High |
|---|---|---|---|
| 48x40 recycled Grade C | $6.50 | $8.75 | $11.00 |
| 48x40 recycled Grade B | $8.50 | $11.50 | $14.00 |
| 48x40 recycled Grade A | $11.00 | $13.50 | $16.50 |
| 48x40 recycled A-clean | $12.50 | $15.00 | $18.00 |
| 48x40 new SYP | $21.00 | $25.00 | $29.00 |
| 48x40 new hardwood | $25.00 | $29.50 | $34.00 |
| Block pallet recycled A | $14.00 | $18.00 | $23.00 |
| 1200x800 EPAL, licensed | $26.00 | $34.00 | $44.00 |
| Heat treatment surcharge | $1.10 | $1.55 | $1.90 |
| Rackable HDPE plastic | $75.00 | $108.00 | $160.00 |
Against our interest
These exist so you can sanity-check a quote, not so you can forecast from them. Freight is 30–50% of the total and it is entirely lane-specific.
You are not comparing the same thing, and the larger number is hidden inside the smaller one.
A Grade C pallet under a racked load is not a saving. It is a deferred incident.
What moves the price
| Driver | What it is | Rough effect |
|---|---|---|
| Freight distance and load size | The largest single variable and the one buyers control most directly. | 30–50% of landed cost |
| Regional core availability | Surplus metros against deficit metros, driven by inbound retail and port volume. | Up to $4 per unit |
| Lumber futures | Direct on new, indirect on recycled through substitution. | Moves both, at different speeds |
| Grade and repair labour | Wage pressure has outpaced lumber for five years. | $2–4 between grades |
| Seasonality | Q4 tightening against Q1 release, plus agricultural harvest spikes. | 8–35% depending on market |
Due diligence
“How long is this price valid?”
“What is the freight line, separately?”
“What does the next trailer break point do to the unit price?”
“What is the adjustment mechanism if lumber moves?”
“What would a standing order save against buying spot?”
The rulebook
The published price series that new pallet costs track, and against which supply agreements are commonly indexed.
US Bureau of Labor Statistics series covering wood containers and pallets, sometimes used as a contract escalator.
Governs firm offers, price terms and how long a quotation binds.
Which is why two quotes at the same price can be for materially different products.
Vocabulary
From the journal
When lumber spikes, both new and recycled pallets get more expensive — at different speeds and for different reasons. The gap between them is where buying decisions live.
The cheapest mile in trucking is the one that was going to be driven anyway. Most pallet buyers are sitting next to one and have never mentioned it.
Every November a customer asks why the price moved. The answer is the same every year and it is not complicated — but it is worth understanding, because you can buy around it.
Questions
Request a quote
Tell us what you’ve got