Using published capacities for point loads
Rated capacities assume uniform distribution. A 900 lb casting on a 40-inch deck does not qualify.
FixAdd stringers, thicken the deck, and use blocking to transfer load into the stringers.
Industry
Manufacturing pallets face concentrated point loads, repeated handling and long dwell times — a different problem from distribution, where pallets move once and leave. The right answer is usually a heavier build with more stringers, kept inside the plant on a repair programme rather than replaced.
Request a quote
Send the quantity and we'll quote your actual lane — not a national average.
Published pallet capacities assume a uniformly distributed load. Manufacturing rarely provides one. A single die, motor, coil or casting concentrates force onto a few square inches of deck, and the deck board beneath it is 0.625 inches thick.
Work-in-progress pallets never leave the building. That changes the economics completely: purchase price is a one-off, and repair, dwell-time deflection and handling damage are the recurring costs. A repair-first programme is almost always cheaper than periodic replacement.
| Approach | Year 1 | Year 3 | Notes |
|---|---|---|---|
| Replace on failure | $28/unit | $84/unit | Three replacements over three years |
| Repair-first programme | $28 + $6 | $28 + $18 | One purchase, periodic repair |
| Heavy build, repair-first | $41 + $4 | $41 + $12 | Higher entry, lowest three-year cost |
The other half of a plant's requirement is outbound: machinery, spares and assemblies that need a crate rather than a deck. We build cleated plywood boxes, heavy skids and engineered cases to drawing, from a single unit — see crates and boxes.
For export, remember that internal blocking and bracing cut on your own dock is wood packaging under ISPM-15 and needs treating like anything else. It is the most common reason a plant's container gets held.


By the numbers
Rules of thumb
Before you order
Where the contact points are matters more than the total. Send the footprint of the feet.
WIP that sits for weeks needs a creep derate that transit loads do not.
Forklift, jack, clamp truck, conveyor, robot. Each has different geometry requirements.
If not, durability and repairability outrank purchase price entirely.
Machinery and spares need crates, and internal bracing is wood packaging under ISPM-15.
Rarely measured, frequently large. Count it before you fix anything else.
What goes wrong
Rated capacities assume uniform distribution. A 900 lb casting on a 40-inch deck does not qualify.
FixAdd stringers, thicken the deck, and use blocking to transfer load into the stringers.
WIP pallets never leave the building, so purchase price is a one-off and repair is the recurring cost.
FixRun a repair-first programme. Three-year cost drops sharply.
It is the most common reason a plant's container gets held.
FixTreated dunnage stock on the dock, physically separated from general timber.
Side by side
| Approach | Year 1 | Year 3 | Notes |
|---|---|---|---|
| Replace on failure | $28/unit | $84/unit | Three replacements over three years |
| Repair-first programme | $28 + $6 | $28 + $18 | One purchase, periodic repair |
| Heavy build, repair-first | $41 + $4 | $41 + $12 | Higher entry, lowest three-year cost |
Against our interest
Every rated figure assumes uniform distribution. A casting on a small contact area does not qualify and can halve the effective capacity.
They never leave the building, so purchase price is a one-off and repair is the recurring cost. Replacement is the expensive path.
Wood creeps under sustained load. A deck that holds fine in transit can sag visibly after months under the same weight.
What moves the price
| Driver | What it is | Rough effect |
|---|---|---|
| Reinforcement | Extra stringers, thicker decking and blocking sized to the load's contact points. | +15–45% over standard |
| Custom footprint | Where equipment dictates the size, lumber yield and setup both suffer. | +15–40% first run |
| Repair programme | The recurring cost that replaces a much larger replacement cost. | $2.20–$4.80 per event |
| Export crating | Quoted per job, with internal bracing that must be treated. | Job-specific |
Due diligence
“What are the contact points of the load, not just its weight?”
“How long does a loaded pallet sit before it moves?”
“What is our inter-plant pallet loss, measured?”
“Is every solid wood component in our export crates treated and marked?”
“Would a repair programme cost less than our current replacement rate?”
The rulebook
Engineering analysis for point loads, deflection and creep — the right tool when a catalogue figure does not apply.
Test methods for pallets and related structures in materials handling and shipping.
Covers export crates, skids and the internal bracing cut on your own dock.
US military unit-load standard, occasionally specified in defence supply contracts.
Vocabulary
From the journal
There is no such thing as an FDA-certified pallet. What exists is your documented control, and an auditor is testing whether you have one.
The strength argument is real and it is not the important one. What decides block versus stringer over a fleet's life is what happens when something breaks.
The pallets were compliant. The crate was compliant. The two lengths of untreated 2x4 wedged against the load were not, and they were the first thing the inspector saw.
Questions
Request a quote
Tell us what you’ve got