Dumpstering site pallets
A roll-off costs $450–$900, holds about 120 pallets and produces no diversion record.
FixBook scheduled removal. It costs less and produces documentation.
Industry
Building products are dense, pallets go one way, and the empties accumulate on a site with no forklift and no space. The two things that matter are a deck that survives brick and block weight, and a removal service that clears the pile before the fire marshal does.
Request a quote
Send the quantity and we'll quote your actual lane — not a national average.
A cube of brick weighs about 2,600 lb on a footprint smaller than the pallet. Block, tile, stone and bagged material behave the same way: high weight, small contact area, and no forgiveness if the deck flexes.
Empties accumulate at the point of use, and construction sites are the worst possible place for that: no forklift, no yard, no space, and a fire load that a site safety officer will eventually notice.
| Option | Cost | Outcome |
|---|---|---|
| Roll-off dumpster | $450–$900 per container | Landfilled, no revenue |
| Burn on site | Illegal in most jurisdictions | Fines, emissions |
| Leave for the next trade | $0 today | Someone else's problem, eventually yours |
| Scheduled pallet removal | Free to modest charge | Recovered, documented diversion |
We collect from sites without loading equipment where access allows, and we take the damaged and odd-size stock along with anything recoverable — see pallet removal.
Construction waste diversion is a scored item in most green building certification schemes. Wood is typically the second-largest diverted stream after concrete and metal, and pallets are a large share of it. Our collection documentation gives tonnage by stream and diversion outcome, in a format that goes straight into a waste management plan.


By the numbers
Rules of thumb
Before you order
Four or five, not three. Dense product on uneven ground needs a shorter unsupported span.
Site ground is never flat. A full bottom deck spreads the load.
Site conditions consume a Grade A premium within one delivery.
Telehandlers often prefer unnotched. Confirm before specifying notches.
Empties accumulate where there is no forklift, no yard and no space.
If the project is chasing a green building credit, the paperwork has to exist.
What goes wrong
A roll-off costs $450–$900, holds about 120 pallets and produces no diversion record.
FixBook scheduled removal. It costs less and produces documentation.
It carries the weight statically but deflects badly under handling and does poorly on uneven ground.
FixFour or five stringers with 0.75 in decking and a full bottom deck.
It is free today and becomes your problem, plus a fire load and a safety finding.
FixNominate someone to own the pile and book collection.
Side by side
| Option | Cost | Outcome |
|---|---|---|
| Roll-off dumpster | $450–$900 per container | Landfilled, no revenue |
| Burn on site | Illegal in most jurisdictions | Fines, emissions |
| Leave for the next trade | $0 today | Someone else's problem, eventually yours |
| Scheduled pallet removal | Free to modest charge | Recovered, documented diversion |
Against our interest
Site conditions consume the premium within one delivery. Grade B is the honest specification.
A cube of brick weighs about 2,600 lb on a small contact area. A standard deck carries it statically and deflects badly under handling on uneven ground.
$450–$900 per container, no revenue and no diversion record. Scheduled removal costs less and produces documentation.
What moves the price
| Driver | What it is | Rough effect |
|---|---|---|
| Build reinforcement | Four or five stringers, 0.75 in decking, full bottom deck. | +20–40% over standard |
| One-way economics | Cost per trip equals purchase price, so the lowest adequate grade wins. | Favours Grade B heavily |
| Site access | No forklift, no yard, restricted hours and shifting locations. | Can force a smaller truck and labour |
| Diversion documentation | Tonnage and outcome recorded for certification submissions. | Usually absorbed in the collection |
Due diligence
“How many stringers, and is there a full bottom deck?”
“Will a telehandler or a forklift handle this — notched or unnotched?”
“Who owns the empty pile on this site?”
“Will we get tonnage and outcome documentation for the waste plan?”
“Can collection be scheduled around the build phases?”
The rulebook
Green building certification schemes that score construction waste diversion, where wood is typically the second-largest diverted stream.
Commonly a contractual requirement on larger projects, and the document your collection records feed.
Idle pallet storage provisions apply on site as well as in a warehouse.
Accumulating material and blocked egress are citable, quite apart from the fire load.
Vocabulary
From the journal
There is no such thing as an FDA-certified pallet. What exists is your documented control, and an auditor is testing whether you have one.
This is the most common serious warehouse hazard I see, it costs nothing to fix, and almost nobody has been told about it.
Any number you cannot interrogate is a marketing claim. Here is exactly how ours is built, including the part that does not flatter us.
Questions
Request a quote
Tell us what you’ve got